Vinton Construction

IH 41 Depere to Wrightstown

Wisconsin Department of Transportation / Wisconsin

http://im.chaoxunshop.com/images/2017%20USH%2041%20Patches/_projectHero/Concrete-Paving.png

Date Completed:

November 2017

Services:

Concrete Pavement

Design Engineer:

Wisconsin Department of Transportation

Construction Engineer:

JT Engineering

Project Summary:

Vinton construction was a subcontractor on this $15 million asphalt mill and overlay project on IH 41 from De Pere to Wrightstown. Vinton’s work consisted of new concrete pavement on the CTH U NB off Ramp, new concrete bridge approaches and Concrete repair and replacement on IH 41.

Contract Amount:

$15,311,894.00

Project Length:

10 Miles

By the Numbers:

  • 4300 SY of 8” to 12-inch Concrete Pavement
  • 5400 SY of 12” Concrete Base
  • 2400 SY of Base Patching SHES
  • 1300 SY of Concrete Pavement Repair and Replacement SHES
IMG_6182
IMG_6163
IMG_6175
IMG_6891
IMG_6905
IMG_6990
2017.10.25-3
IMG_2373
2017.06.23-2
2017.06.02-1
IMG_2374